This 5,000 sq. ft. buildout happened from the ground floor up. Framing, drywall, static-free tiling, painting, HVAC, AC, DC, fire suppression all took place. APS's part included setting (2) 3200 amp Benning Power Plants, placing redundant A-B BDFB's, (4) strings of -48VDC batteries, ground bus, aisle grounds, header board, aux bar, ladder rack, stanchions, setting of chassis cabinets and fuse panels, power cable, lacing, and labeling.