In the Spring of 2011 we completed the construction, installation, and wiring of (3) strings of C&D flooded batteries @ 480VDC. Almost 200 flooded cells were set, along with the build-out of battery rack, and spill containment systems for each string. On this project we also cabled, lugged and crimped to the battery disconnects, which accumulated to over 500' of wire.