In the Spring of 2008 we completed the construction, installation, and wiring of (11) strings of C&D flooded batteries @ 480VDC. Over 1,000 flooded cells were set along with the build-out of spill containment systems for each string. On this project we also cabled, lugged and crimped to the battery disconnects, which accumulated to over 8,000' of wire.
